top of page

![]() | ![]() | ![]() |
---|

BEFORE
Breakroom BEFORE HEP Construction Renovation

AFTER

AFTER
BEFORE
AFTER
This Break Room located in Fort Belvoir Army Base was fully renovated and painted. Work included electrical, millwork, and plumbing. Carpeting was removed, floor was resurfaced , and lockers were installed.
• Demolition
• Drywall
• Paint
• Plumbing
• Flooring
• Cabinet Installation
bottom of page