Fort Belvoir Breakroom Renovation

Client

Metropolitan Washington Airports Authority

Cost

$406,000

Completed

2012

BEFORE
BEFORE

Breakroom BEFORE HEP Construction Renovation

press to zoom
AFTER
AFTER
press to zoom
AFTER
AFTER
press to zoom

BEFORE

AFTER

This Break Room located in Fort Belvoir Army Base was fully renovated and painted. Work included electrical, millwork, and plumbing. Carpeting was removed, floor was resurfaced , and lockers were installed.  

• Demolition

• Drywall

• Paint

• Plumbing

• Flooring

• Cabinet Installation