top of page

Fort Belvoir Breakroom Renovation

Client

Metropolitan Washington Airports Authority

Cost

$406,000

Completed

2012

BEFORE

AFTER

This Break Room located in Fort Belvoir Army Base was fully renovated and painted. Work included electrical, millwork, and plumbing. Carpeting was removed, floor was resurfaced , and lockers were installed.  

• Demolition

• Drywall

• Paint

• Plumbing

• Flooring

• Cabinet Installation

bottom of page